Town planning

The town planning department can provide you with information and support for your property projects.

Town Planning Department - Hôtel de Ville, 1 rue de la Marianne, 34420 Villeneuve-lès-Béziers

Tel: 04 67 39 47 80 - Email: urbanisme@villeneuve-les-beziers.fr

Electronic applications for planning permission

Since 1 January 2022, we have been ready to receive your applications quickly and easily. You will need to identify the official Cerfa that you will need to select in the submission portal. You can access the Cerfa from the public service.

IMPORTANT: If you make a mistake in filling in the form, forget to submit a document or submit the wrong document (etc...), the application cannot be amended without the intervention of the instructing officer. Please do not submit a new application and send an e-mail to the Planning Department mentioning the errors.

Also, in the event of an unintentional error (e.g. submitting a file twice), you can request that your file be withdrawn. See procedure here: https://gnau.beziers-mediterranee.fr/gnau/fichiers/05_DEMANDER_SUPPRESSION_DOSSIER.pdf

Local Town Planning Scheme (PLU)

In this section, you can consult the commune's Local Planning Scheme and its regulations by visiting the official Géoportail de l'urbanisme website.

Formalities

Planning permission allows the local authority to check that the work complies with planning regulations. Depending on the type of project and the location, you will need to submit an application for planning permission (building permit, development permit, etc.) or a preliminary works declaration. Before starting any work, it is advisable to apply for a planning certificate to obtain information about the plot of land on which the work is to be carried out.

Facade renovation

The restoration of buildings is subject to prior declaration in all sectors and to the agreement of the Bâtiments de France architect in the town centre.) 

The file consists of :

  • Preliminary Declaration Form
  • DP 1 : Location map
  • DP 11: Project description : example
  • DP 5: Representation of the project (elements may be indicated by hand on the photographs)
  • DP 6 : Representation of the project after modification (photomontage, sketch...)
  • DP 7: Photographs of the façade
  • DP 8: Photographs of the façade and neighbouring façades from the property or from the street

Installing an air conditioner

Changes to the external appearance of a building are subject to prior declaration in all sectors and to the agreement of the architect of Bâtiments de France in the town centre.

The file consists of :

  • Preliminary Declaration Form
  • DP1 : Location map:  planCadastralNormalisecentrevilleAA
  • DP 11: Description of the work: description of the system (materials, colour, dimensions) and location of the system (roof, attic, box, etc.). 
  • DP 5: A representation of the project, e.g. a diagram, a sketch, possibly photographs of the roof and facade with an indication of where the device will be installed.
  • DP 6: a graphic document showing the project after modification (photomontage, sketch, etc.)
  • DP 7: Photographs of the façade and/or roof
  • DP 8: Photographs of the façade and neighbouring façades and/or the roof from the property or from the street

Installing solar/photovoltaic panels

Changes to the external appearance of a building are subject to prior declaration in all sectors and to the agreement of the architect of Bâtiments de France in the town centre (500m perimeter around the church).

When the building is located within the protection perimeter of a listed historic monument (church), the Architecte des Bâtiments de France may not authorise the installation of photovoltaic panels on the roof of the building, particularly if their surface area is too large in relation to the surface area of the roof.

Where possible, panels may be installed on the roof of a single-storey annex, not visible from the public space, and not on the main roof of the building.
They could also be studied on a pergola covering a terrace if necessary.

Otherwise, the project may be accepted if it complies with the following:

  • Installed on top of the roof, preferably in a single strip (using a simple rectangular geometry) just above the eaves on the lowest part of the slope. Under no circumstances should they be close to the ridge. The longest side of each panel should be laid in the direction of the slope of the roof.
  • The panels will be brown or terracotta in colour.
  • The finish will be matt. Frames and supports will be the same colour as the panels.

The file consists of :

  • Preliminary Declaration Form
  • DP 1 : Location map
  • P 11: Description of the work: description of the device (power, materials, colour, dimensions) and location of the device.
  • DP 5: A representation of the project, e.g. a diagram, a sketch, possibly photographs of the roof and facade with an indication of where the panels will be installed.
  • DP 6: a graphic document showing the project after modification (photomontage, sketch, etc.)
  • DP 7: Photographs of the roof
  • DP 8: Photographs of the roof from the site or from the street

Sources: The Unités Départementales de l'Architecture et du Patrimoine (UDAP), the CAPEB, the C.A.U.E and the Agence Locale de l'Energie have joined forces to produce this guide.

Extracts

Land registry

This service allows you to search, view and order these map sheets.

Rental permits

The Communauté d'Agglomération Béziers Méditerranée has introduced a "permit to rent" scheme to combat substandard housing. The municipality of Villeneuve has adopted this scheme for a given area (see map).

This prior authorisation is issued by the Communauté d'Agglomération to owners who wish to launch a new letting of their property.

If your property falls within the area covered by the scheme and you change tenants, you must apply for prior authorisation to let it.

You can contact the Agence de l'Habitat if you have any questions about the scheme. A technician will carry out an inspection of the property. Authorisation to let the property may be granted, subject to conditions or refused. Reasons will be given for any decision to refuse or grant permission, and will specify the nature of the work or improvements required.

Contact details

Agence de l'Habitat, 1 Avenue du Président Wilson, 34500 BEZIERS
Tel.: 04.99.41.34.94
Mail : agencehabitat@beziers-mediterranee.fr

Cerfa form : cerfa n°15652*01

Grants and subsidies - Housing

To find out all you need to know about the support available for housing and energy saving in the area, the Agglo provides a one-stop shop: the Agence de l'Habitat (Housing Agency), run by a team of technicians. 

It offers information and free, personalised advice. It will help you with the procedures and aid available for your project (ANAH aid and the Agglo's own funds).

Contact: 

Agence de l'Habitat 1 avenue du Président Wilson
34500 Béziers  
8.30am-12.30pm and 1.30pm-5pm  
Tel.: 04 99 41 34 94  
agencehabitat@beziers-mediterranee.fr

Notice of electronic public participation

05/11/2024

NOTICE OF ELECTRONIC PUBLIC PARTICIPATION PRIOR TO APPROVAL OF THE DOSSIER FOR THE CREATION OF THE "LA CLAUDERY" ZAC.

In accordance with the provisions of article L123-19 of the French Environment Code, an electronic public consultation is being organised on the project to create the "La Claudery" Concerted Development Zone (ZAC). This project, which is subject to an environmental assessment, concerns the extension of the "La Claudery" business park in the municipality of Villeneuve-lès-Béziers.

Public participation by electronic means will take place over a period of 31 consecutive days: from Monday 25 November at 8:00 a.m. to Thursday 26 December 2024 inclusive.

Ascrew: link

Dedicated platform : 

https://www.democratie-active.fr/zac-claudery-ppve/ where all the documents making up the application file can be downloaded.

Electronic register :

https://www.democratie-active.fr/zac-claudery-ppve

Email : zac-claudery@democratie-active.fr

At the end of the electronic public participation, the authority responsible for taking the decision to approve the "La Claudery" ZAC development file, i.e. the Commune of Villeneuve-lès-Béziers, will publish a summary of the public's comments and proposals and the project owner's responses to these comments and proposals. These documents will be available for consultation for at least three months on the Town Hall's website and on the website dedicated to the participation procedure at the following address: https://www.democratie-active.fr/zac-claudery-ppve/

At the end of the electronic public participation period, the "La Claudery" ZAC development plan, which may be amended to take account of comments, opinions and proposals, will be submitted to the Villeneuve-lès-Béziers town council for approval.

05/11/2024

NOTICE OF ELECTRONIC PUBLIC PARTICIPATION PRIOR TO APPROVAL OF THE CREATION DOSSIER FOR THE "PECH AURIOL - LE CROS" ZAC.

Pursuant to the provisions of article L.123-19 of the Environmental Code, an electronic public consultation is being opened and organised from 25 November to 26 December 2024 inclusive concerning the project for the "Pech Auriol - Le Cros" ZAC development plan.

Public participation by electronic means will take place over a period of 31 consecutive days: from Monday 25 November at 8:00 a.m. to Thursday 26 December 2024 inclusive.

Ascrew: link

Dedicated platform : 

https://www.democratie-active.fr/zac-pech-auriol-le-cros-ppve

Electronic register :

https://www.democratie-active.fr/zac-pech-auriol-le-cros-ppve

Email : zac-pech-auriol-le-cros@democratie-active.

At the end of the electronic public participation, the authority responsible for taking the decision to approve the "Pech Auriol - Le Cros" ZAC development dossier, i.e. the Commune of Villeneuve-lès-Béziers, will publish a summary of the public's comments and proposals and the project owner's responses to these comments and proposals. These documents will be available for consultation for a minimum of three months on the Town Hall's website and on the website dedicated to the participation procedure at the following address: https://www.democratie-active.fr/zac-pech-auriol-le-cros-ppve/

At the end of the electronic public participation period, the "Pech Auriol - Le Cros" ZAC development plan, which may be amended to take account of comments, opinions and proposals, will be submitted to the Villeneuve-lès-Béziers town council for approval.

Compensatory project for the Castelfort Montblanc estate

INITIAL ECOLOGICAL STATUS_COMPENSATORY SITE CASTELFORT_ALTEMIS-202312

New Montpellier-Perpignan line

Zoning plan of the PLU with reserved sites n°11 and 12 for SNCF RÉSEAU :

Part 4.2 - Graphic regulations 1-7500 Villeneuve

PPR

MINGUEZ" technological risk prevention plan

Approval date: 06/03/2013

Approval order

Approval order

Presentation report

Zoning map

Regulations 

Appendices

Hazard map

Other appendices

GAZECHIM" technological risk prevention plan

Approval date: 03/08/2015

Approval order

Presentation report

Zoning map

Regulations 

Appendices

Other appendices

Statement of information following the floods of October 2019

RISK STUDIES NOTIFIED TO LOCAL AUTHORITIES

When a natural risk prevention plan is approved for a municipality, this plan provides a precise framework for building possibilities. However, it is not the only source of information to be taken into account, and all available additional knowledge of the risks must be used to assess the risk, particularly when drawing up town planning documents and examining planning permission. The Prefect must provide the municipalities with all the technical studies at his disposal that are necessary for them to exercise their town planning powers (Article L.132-2 of the Town Planning Code). To this end, the studies listed below have been brought to their attention. Source : Prefecture of Hérault

Flooding

28/09/2020

Hazard map for the flood of 23 October 2019 and associated planning notice

Appendix - PAC- Alea flood map Villeneuve-les-Beziers 2020-09-28

Appendix - PAC - leaflet associated with flood hazard map 23 October 2019

PAC_PHE_Villeneuve_les_Beziers_2020_09_28

Multi-risk

09/06/2017

Natural or technological risk definition sheet(s) for campsites and residential leisure parks in the Hérault. These sheets summarise, for each establishment and based on all the information drawn up by or at the request of the State, the delimitation of areas subject to foreseeable natural or technological risk and the extent of exposure. A map showing the location of the campsite in relation to the risks taken into account is also appended.

ZIP archive of all the campsites in the commune

Rainwater drainage regulations for the Communauté d'Agglomération Béziers Méditerranée

The purpose of these regulations is to define the specific measures prescribed for the territory of the agglomeration community in terms of run-off control, treatment and discharge of rainwater into public underground or open-air networks. To this end, it specifies the general legislative framework.

Unroll the extract from the rules

7- General rules

a) It is forbidden to connect rainwater to the sewerage system or to an independent sewerage system.

b) Any increase in runoff caused by new waterproofing (creation or extension of existing buildings or infrastructures) must be compensated for by the installation of rainwater storage systems on the plot (infiltration or retention basins) or other alternative techniques*.

New waterproofing must be compensated for to the extent of 130 litres/m². (minimum) with a maximum leakage rate of 50 l/s per hectare of waterproofing.

If infiltration is not possible (or if the infiltration rate is insufficient) and there is no outlet, diffuse spreading may be considered at a regulated rate of 5 l/s/waterproofed hectare, subject to acceptance by the municipality.

The retention volume to be used in this case is : 170 l/m² of waterproofing.

c) The volume stored must be emptied by infiltration as a priority and not connected to the public network.

d) For building permits involving the demolition of existing buildings, the sizing of the works must take into account all the waterproofed surfaces of the land unit, regardless of the previous degree of waterproofing.

e) In the case of grouped urban development projects (housing estates, ZACs, etc.), storage facilities must be shared by the whole project in order to avoid storage on each plot. Storage facilities created as part of a subdivision permit must be sized for the roadway and for the total waterproofed surfaces likely to be created on each lot.

* Alternative techniques complement or replace conventional sewerage systems. Their main function is to limit peak flows downstream in order to prevent the concentration of water in saturated networks:

  • by infiltration when the soil is suitable and outside the catchment protection area,
  • by temporary storage of rainwater before releasing it at a controlled rate into the downstream network (drains, gutters, ditches, etc.) if infiltration is impossible or prohibited,
  • by combining temporary storage and infiltration.

A non-exhaustive catalogue of plot-based storage techniques is presented in the appendix to the regulations: ditches, drainage trenches, storage roofs, porous soils, reservoir pavements, etc.

Information packs Town Hall

Dossier d'Information Mairie Free

Avenue Pierre Bérégovoy Pôle Méditerranée

Link to the file

Dossier d'Information Mairie

(Complies with the specifications of the Bee Law and the Order of 12 October 2016)Concerning the installation of a new radio installation on site T04D49

3 avenue ANDRE PALMADE 34420 VILLENEUVE-LES-BEZIERS

Dossier information Mairie - ANDRÉ PALMADE T04D49

Dossier d'Information Mairie

(Complies with the specifications of the Bee Law and the Order of 12 October 2016)Concerning the installation of a new radio installation site T03FA1 to replace another - Chemin du Cros 34420 CERS

Link to dossier : Information folder Mairie Ch du Cros

Advice sheets: maintaining, renovating or building in old town centres

To preserve the heritage and harmony of old town centres, the Drac Occitanie has joined forces with all 13 of the region's Unités Départementales de l'Architecture et du Patrimoine (Udap) and Conseils d'Architecture, d'Urbanisme et de l'Environnement (CAUE) to produce "Old Town Centres" advice sheets.

These fact sheets are an advisory and educational tool aimed primarily at the general public and all those involved in the living environment. They serve as a guide for work in old town centres to maintain, rehabilitate, renovate or build.

Each advice sheet focuses on a specific aspect of architecture and landscape: facades, roofs, windows, shutters, doors, ironwork and thermal comfort.

Coated façades

PDF - 2 MB

1 - Rendered facades

Plaster finishes

PDF - 4 MB

2 - Coated finishes

Ashlar facades

PDF - 3 MB

3 - Stone facades

Stone decorations

PDF - 3 MB

4 - Stone decor

Canal tile roofs

PDF - 2 MB

5 - Tiled roofs

Roof overhangs

PDF - 2 MB

6 - Roof overhangs

The windows

PDF - 2 MB

7 - Windows

Shutters

PDF - 2 MB

8 - Shutters

The doors

PDF - 3 MB

9 - Doors

Ironwork

PDF - 3 MB

10 - Wrought iron

Fences

PDF - 3 MB

11 - Fences

In front of the house

PDF - 3 MB

12 - In front of the house

Modifications to bays

PDF - 2 MB

13 - Modifications to bays

Roof modifications

PDF - 2 MB

14 - Roof modifications

Thermal comfort

PDF - 1 MB

15 - Thermal comfort